How do I insert a replacement meter?

Prev Next
   
  • PT

  • ES


To insert a replacement meter, follow these steps:
  1. Go to Assets | Measurements | Meters;
  2. Select a meter;
  3. Click on the Operations button to access the meter readings list;
  4. Click on Create and then on Replace Meter;
  5. Fill in the replacement meter reading value. The new reading can be zero if the meter has been replaced by a new meter or, if it is a used meter, its current value (lower or higher than the current reading of the old meter, equal to or greater than zero).

The value of the meter that corresponds to a meter replacement:

  1. keeps the current cumulative reading of the meter;
  2. maintains the meter's current average;
  3. ensures the increment is zero. Replacing a meter does not mean taking a new reading, it just means resetting the current value;
  4. ensures the unit cost and the total cost is zero;
The replacement date must be greater than the last reading.