--- title: "How to consume spare parts in the work order?" slug: "1723138864" tags: ["Settings"] updated: 2026-10-23T16:15:11Z published: 2026-10-23T16:15:11Z canonical: "help.ila.cegid.com/1723138864" --- > ## Documentation Index > Fetch the complete documentation index at: https://help.ila.cegid.com/llms.txt > Use this file to discover all available pages before exploring further. # How to consume spare parts in the work order? - [x] PT - [x] ES --- On the **asset** form (location, equipment or tool), you can specify the **parts** and the respective **quantities** that the asset needs to work properly. The parts associated with assets are in the **Spare Parts** section and can be consumed in the work order **automatically** or **manually**. --- ## Automatic consumption To enable the automatic consumption of spare parts, follow these steps: 1. Go to the desired work order type, in **Settings | Work | Work Order Types**; 2. In the **Costs** section, enable the **Consumption from spare parts** option. When a work order changes for the first time to a **state** that allows **cost recording**, a consumption with the parts defined in the **Spare Parts** section of the **asset form** is recorded **automatically**. **Automatic consumption** only happens on that **first change**. If there is not enough **stock**, the consumption is not performed. --- ## Manual consumption When a work order is in a state that allows **cost recording**, you can record **material consumptions**. To create a material **consumption** with **spare parts**, follow these steps: 1. Go to **Work | Work Orders**; 2. In the list of work orders, select the desired work order; 3. On the work order form, click on **Operations** and select **Consumptions**; 4. In the **Report Consumptions**, click on the arrow next to the **Create** button and select **Copy From Spare Parts**; 5. On the **Copy Consumptions** screen, in the **Spare Parts** section, select the desired parts; 6. Click on **Create Consumption**. When filling in the consumption report, the following rules apply: - By default, the **equipment**, **tool** or **location** field is filled in with the work order's asset; - If the work order is for a **route**, choose the asset category and fill in the corresponding asset field; - You can only select warehouses of the company for which the requisition was registered; - You can only record a quantity equal to or lower than the quantity selected in the requisition; - The **workshop manager** to which the work order belongs can **create**, **edit** and **delete** records on behalf of the technician.